CALA Group Limited is a British housebuilding company headquartered in Edinburgh, Scotland. It has grown to become one of the largest housebuilders in the UK.
From the homes listed with HomePortfolio and on Cala Homes’s own site. A home that left the listings was most likely reserved or sold; a builder does not say which.
Ofsted and Get Information about Schools, via HomePortfolio.
Everyday places
How many of each are within 1.6 km, and the walk to the nearest.
8 supermarkets and groceriesBP, 900 m11 min
7 places to eatJerk & Braai Cafe, 920 m11 min
2 pubsSoda, 0.8 miles16 min
People and households
The neighbourhood around it (South Cambridgeshire 004A) against South Cambridgeshire as a whole.
People
1,612
Households
695
In good or very good health
89% vs 86%
Age profileShare of everyone in each five-year band
This neighbourhoodSouth Cambridgeshire
15%10%5%0%
Getting around
How far everyday errands, public transport and cycling go from here, and how people here travel to work.
No walk, transit or bike scores for this postcode.
Getting to work
This neighbourhood43%45%
South Cambridgeshire44%44%
Work from home43%
Broadband and mobile
What the 1 homes within 150 m record: a new home is usually served by the same networks.
Broadband
No broadband records for the homes around it.
Mobile signal
No mobile records for the homes around it.
Ofcom Connected Nations, via HomePortfolio. Ofcom copyright.
Risks
Flooding, radon, ground, noise and air at this spot.
Flooding from rivers and the seaNot knownNot assessed hereThe flood risk assessment covers England only.
Flooding from surface waterNot knownNot assessed hereThe flood risk assessment covers England only.
RadonLowUnder 1% of homes above the action levelThe lowest of six radon classes.
Ground stabilityLowLow landslide susceptibilityFrom the British Geological Survey’s landslide map of the area.
NoiseNot knownNot mapped hereStrategic noise maps cover major roads, railways and airports only.
Air qualityModerate
Crime
Police-recorded crime in the neighbourhood, December 2025 to September 2026, against South Cambridgeshire.
40.2crimes a year per 1,000 residentsBelow South Cambridgeshire at 6454 recorded in 10 months
Month by monthCrimes per 1,000 residents
This neighbourhoodSouth Cambridgeshire
7.552.50
Planning nearby
Applications within 500 m in the last 3 years: when each was made and how it went, the larger schemes listed first.
32 applications
5 approved
6 awaiting decision
Approved
Sold nearby
Homes sold within 1 km in the last two years, new build and resale.
Median resale
None
Median new build
£499,950
Sales
17 17 new, 0 resale
Every salePrice paid, by the date it completed
New buildResale
£800K£600K£400K£200K
2 gyms and leisureLet's Get Physical - Fitness Classes, 640 m
8 min
Overture Maps places, via HomePortfolio.
01020304050607080
Show the figures
Age profile
Age
This neighbourhood
South Cambridgeshire
0 to 4
11%
5%
5 to 9
6%
6%
10 to 14
4%
7%
15 to 19
3%
5%
20 to 24
3%
4%
25 to 29
10%
5%
30 to 34
14%
6%
35 to 39
12%
7%
40 to 44
10%
7%
45 to 49
6%
7%
50 to 54
5%
7%
55 to 59
4%
7%
60 to 64
3%
6%
65 to 69
2%
5%
70 to 74
2%
5%
75 to 79
1%
4%
80 to 84
1%
3%
85 and over
1%
3%
Households
This neighbourhood67%27%
South Cambridgeshire69%26%
Families67% vs 69%
One person27% vs 26%
Other households6% vs 5%
Homes are
This neighbourhood17%36%13%31%
South Cambridgeshire36%32%14%14%
Owned outright17% vs 36%
Owned with a mortgage36% vs 32%
Shared ownership3% vs 3%
Socially rented13% vs 14%
Privately rented31% vs 14%
Adults are
This neighbourhood79%
South Cambridgeshire63%23%
In work79% vs 63%
Retired9% vs 23%
Students3% vs 4%
Looking for work2% vs 2%
Caring, sick or other8% vs 8%
Highest qualification
This neighbourhood54%15%15%
South Cambridgeshire48%14%19%12%
Degree or higher54% vs 48%
A levels15% vs 14%
GCSEs15% vs 19%
Apprenticeship4% vs 5%
Cars per household
This neighbourhood13%48%39%
South Cambridgeshire41%48%
None13% vs 11%
One48% vs 41%
Two or more39% vs 48%
ONS Census 2021 and ONS pay by council (ASHE), via HomePortfolio.
vs 44%
Drive45% vs 44%
Bus, train or tube4% vs 3%
Walk or cycle7% vs 9%
Walk Score® (walkscore.com), ONS Census 2021 and Overture Maps places, via HomePortfolio.
Nitrogen dioxide 5.6, PM2.5 7, PM10 12
Above the WHO guideline for PM2.5 (2024, µg/m³).
Air quality, 2024
Nitrogen dioxide5.6 µg/m³ · within the guideline
WHO 10
PM2.57 µg/m³ · 1.4 times the guideline
WHO 5
PM1012 µg/m³ · within the guideline
WHO 15
Environment Agency NaFRA2, BGS and UKHSA radon, BGS GeoSure, Defra noise mapping and Pollution Climate Mapping, via HomePortfolio.
3.1
DecMarJunSep
September 2026: 5 crimes here, 3.1 per 1,000: South Cambridgeshire: 5.79 per 1,000
Show the figures
Crime month by month
Month
Crimes here
Per 1,000 here
Per 1,000 across South Cambridgeshire
December 2025
2
1.24
4.56
January 2026
4
2.48
4.64
February 2026
7
4.34
5.03
March 2026
3
1.86
4.94
April 2026
10
6.2
5.21
May 2026
4
2.48
5.74
June 2026
7
4.34
5.79
July 2026
10
6.2
5.96
August 2026
2
1.24
5.71
September 2026
5
3.1
5.79
Most recordedIn the neighbourhood, 10 months
Violence and sexual offences20
Anti-social behaviour8
Vehicle crime5
Burglary3
Criminal damage and arson3
data.police.uk, via HomePortfolio. Crimes are mapped to an approximate location.
Awaiting decision
Refused
Withdrawn
2026AprJulOct
ApprovedLarge scheme260 mReserved matters approval (appearance, access, landscaping, layout and scale) for the development of four blocks comprising 387 Build to Rent (BtR) dwellings with associated resident amenity areas (Use Class C3) and 482 sq.m (GEA) of flexible commercial floorspace (Use Class E), areas of open space and public realm including a Lakeside Promenade and Civic Plaza, cycle storage, waste storage and substation buildings and all associated infrastructure including: access junctions, access/internal roads, parking, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, roof mounted solar panels, green roofs, street lighting, external hard landscaping, soft landscaping and planting, ecological mitigation, footways / cycleways, car and cycle parking, boundary treatments, street furniture, lake-edge engineering works, any necessary temporary stockpiling of construction materials, areas for construction use, land reprofiling, temporary haul routes and any necessary demolition at Parcels 6.1, 6.2, 7.1 and 7.2 at Key Phase 1 of the Waterbeach Barracks and Airfield development pursuant to Condition 3 of the outline planning consent ref: S/0559/17/OL (Environmental Impact Assessment application with Environmental Statement)Made 29 Jul 2026 · decided 26 Oct 2026 · 26/02870/REM
Awaiting decisionLarge scheme300 mReserved matters approval of access, appearance, landscape, layout and scale for the construction of 276 dwellings, up to 126 sq.m of floor space for retail, services and employment (Use Class A1, A2, and A3) provision at Parcels 8.1, 8.2, 8.3, 9.1 and 9.2 at Key Phase 1 of the Waterbeach Barracks and Airfield development pursuant to Condition 3 of the outline planning consent ref: S/0559/17/OL including: garage buildings, outbuildings, access junctions, access roads, parking, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways, boundary treatments, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolitionMade 14 Jul 2026 · 26/02681/REM
OtherLarge scheme340 mReserved matters approval of access, appearance, landscape, layout and scale for the construction of 17 dwellings at Waterbeach Gardens (Parcel 5.4) at Key Phase 1 of the Waterbeach Barracks and Airfield development pursuant to Condition 3 of the outline planning consent ref: S/0559/17/OL including: access junctions, access roads, parking, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways, boundary treatments, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.Made 11 Feb 2026 · 26/00534/REM
OtherMedium scheme270 mReserved Matters approval of access, appearance, landscape, layout and scale in respect of works to construct Space for Imaginative Play at Waterbeach Woods, Waterbeach Gardens, Waterbeach Gardens East and Waterbeach Lakeside East, Local Area for Play and Community Play at Waterbeach Gardens East, and Local Equipped Area for Play at Waterbeach Gardens, ground remodelling, and associated works at the existing located at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), including: hard and soft landscaping, land reprofiling, planting, any necessary demolition, areas for construction use and temporary stockpiling, and works to create construction access.Made 11 Feb 2026 · 26/00531/REM
Awaiting decisionSmall scheme230 mSubmission of details required by condition 20 (Highway Adoption) of outline planning permission S/0559/17/OLMade 2 Nov 2026 · S/0559/17/COND20F
ApprovedSmall scheme230 mSubmission of details required by condition 20 (Highway Adoption) of outline planning permission S/0559/17/OLMade 5 Oct 2026 · decided 14 Oct 2026 · S/0559/17/COND20E
Local planning authorities’ registers, via HomePortfolio.
2025AprJulOct
Show the figures
Homes sold nearby
Price
Home
Sold
Distance
£775,000
Detached · new build · 165 m²
31 Oct 2025
420 m
£575,000
Terraced · new build · 167 m²
19 Sept 2025
470 m
£285,000
Flat · new build · 75 m²
19 Sept 2025
370 m
£595,000
Terraced · new build · 167 m²
29 Aug 2025
480 m
£750,000
Detached · new build · 165 m²
4 Jul 2025
450 m
£490,000
Terraced · new build · 104 m²
30 Jun 2025
260 m
£689,950
Terraced · new build · 163 m²
30 Jun 2025
330 m
£489,950
Detached · new build · 104 m²
27 Jun 2025
250 m
£485,000
Semi-detached · new build · 104 m²
26 Jun 2025
250 m
£295,000
Flat · new build · 72 m²
20 Jun 2025
370 m
£310,000
Flat · new build · 84 m²
30 May 2025
370 m
£500,000
Flat · new build · 127 m²
28 Feb 2025
470 m
£499,950
Detached · new build · 104 m²
28 Feb 2025
280 m
£775,000
Detached · new build · 165 m²
28 Feb 2025
480 m
£296,000
Flat · new build · 74 m²
31 Jan 2025
370 m
£550,952
Detached · new build · 152 m²
19 Dec 2024
300 m
£296,000
Flat · new build · 75 m²
29 Nov 2024
370 m
HM Land Registry Price Paid with EPC floor areas, via HomePortfolio.